| Assessment Year | 1995 |
|---|---|
| Principal Product | ice cream |
| NAICS |
n/a
|
| SIC | 2024: Ice Cream and Frozen Desserts |
| Sales Range | $10 M to 50M |
| # of Employees | 57 |
| Plant Area |
65,467
ft2
|
| Annual Production | 6,000
Tgal
|
| Production Hrs. Annual | 4,800
hrs
|
| Location (State) | Iowa |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $276,148 | 5,951,641 |
kWh
|
$0.046 |
| Natural Gas | $47,293 | 14,352 |
MMBtu
|
$3.30 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $48,606 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $7,744 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2621: Modify refrigeration system to operate at a lower pressure | $38,625 | $95,200 |
$38,625
832,356
kWh
|
- | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $5,391 | $1,567 |
$5,391
116,061
kWh
|
- | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,854 | $22 |
$1,854
39,859
kWh
|
- | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $416 | $175 |
$416
9,086
kWh
|
- | |
| 05 | 2.4314: Use synthetic lubricant | $267 | $870 |
$267
5,862
kWh
|
- | |
| 06 | 2.7135: Install occupancy sensors | $511 | $1,743 |
$511
11,137
kWh
|
- | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $499 | $371 |
$499
10,844
kWh
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $352 | $484 |
$352
7,620
kWh
|
- | |
| 09 | 2.1213: Direct warmest air to combustion intake | $691 | $500 | - |
$691
-
MMBtu
|
|
| TOTAL RECOMMENDED | $48,606 | $100,932 |
$47,915
1,032,825
kWh
|
$691
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $7,744 | $1,960 |
$7,744
166,764
kWh
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs