ITAC Assessment: IA0125
ITAC logo
ITAC Assessment: IA0125
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product ice cream
NAICS
n/a
SIC 2024: Ice Cream and Frozen Desserts
Sales Range $10
M
to 50
M
# of Employees 57
Plant Area 65,467
ft2
Annual Production 6,000
Tgal
Production Hrs. Annual 4,800
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $276,148 5,951,641
kWh
Natural Gas $47,293 14,352
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $48,606 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,744

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2621: Modify refrigeration system to operate at a lower pressure $38,625 $95,200 $38,625
832,356
kWh
-
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $5,391 $1,567 $5,391
116,061
kWh
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,854 $22 $1,854
39,859
kWh
-
04 2.4221: Install compressor air intakes in coolest locations $416 $175 $416
9,086
kWh
-
05 2.4314: Use synthetic lubricant $267 $870 $267
5,862
kWh
-
06 2.7135: Install occupancy sensors $511 $1,743 $511
11,137
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $499 $371 $499
10,844
kWh
-
08 2.7142: Utilize higher efficiency lamps and/or ballasts $352 $484 $352
7,620
kWh
-
09 2.1213: Direct warmest air to combustion intake $691 $500 - $691
-
MMBtu
TOTAL RECOMMENDED $48,606 $100,932 $47,915
1,032,825
kWh
$691
-
MMBtu
TOTAL IMPLEMENTED $7,744 $1,960 $7,744
166,764
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs