ITAC Assessment: OK0761
ITAC logo
ITAC Assessment: OK0761
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Above ground storage tanks
NAICS 332313: Plate Work Manufacturing
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $100
M
to 500
M
# of Employees 130
Plant Area 130,000
ft2
Annual Production 70
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $216,737 3,156,300
kWh
Natural Gas $56,663 7,794
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,306 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,306

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $2,213 - $2,213
36,305
kWh
-
02 2.2437: Recover waste heat from equipment $14,263 $4,638 - $14,263
-
MMBtu
03 2.7135: Install occupancy sensors $525 $2,871 $525
7,614
kWh
-
04 2.6232: Install set-back timers $3,105 $1,908 - $3,105
-
MMBtu
05 4.611: Begin a practice of predictive / preventative maintenance $5,200 - $5,200
-
kWh
-
TOTAL RECOMMENDED $25,306 $9,417 $7,938
43,919
kWh
$17,368
-
MMBtu
TOTAL IMPLEMENTED $25,306 $9,417 $7,938
43,919
kWh
$17,368
-
MMBtu
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs