ITAC Assessment: OK0759
ITAC logo
ITAC Assessment: OK0759
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Pet food
NAICS 311111: Dog and Cat Food Manufacturing
SIC 2047: Dog and Cat Food
Sales Range $50
M
to 100
M
# of Employees 350
Plant Area 420,000
ft2
Annual Production 13,000,000
pieces
Production Hrs. Annual 7,488
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $701,353 15,103,500
kWh
Natural Gas $1,885,117 465,132
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $217,850 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,904

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4239: Eliminate or reduce compressed air usage $10,284 $11,736 $10,284
756
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,620 $967 $1,620
134
kWh
-
03 2.1212: Operate boilers on high fire setting $18,069 $17,500 - $18,069
-
MMBtu
04 2.1232: Keep boiler tubes clean $158,338 $6,876 - $158,338
-
MMBtu
05 2.2136: Install / repair insulation on steam lines $14,208 $5,500 - $14,208
-
MMBtu
06 2.4226: Use / purchase optimum sized compressor $15,331 $1,619 $15,331
1,127
kWh
-
TOTAL RECOMMENDED $217,850 $44,198 $27,235
2,017
kWh
$190,615
-
MMBtu
TOTAL IMPLEMENTED $11,904 $12,703 $11,904
890
kWh
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs