ITAC Assessment: WI0032
ITAC logo
ITAC Assessment: WI0032
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product COMPRESSED GAS CYLINDERS
NAICS
n/a
SIC 3443: Fabricated Plate Work (Boiler Shops)
Sales Range $10
M
to 50
M
# of Employees 132
Plant Area
n/a
Annual Production 200,000
pieces
Production Hrs. Annual 4,200
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $306,097 4,769,050
kWh
Natural Gas $336,070 112,975
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,285 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,456

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4312: Improve lubrication practices $31,106 - $31,106
484,760
kWh
- -
02 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,304 - $1,304
20,223
kWh
- -
03 2.3132: Recharge batteries on during off-peak demand periods $912 - $912
-
kWh
- -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $3,240 - $4,080
-
kWh
- $(-840.0)
05 2.2437: Recover waste heat from equipment $5,542 $3,000 - $5,542
-
MMBtu
-
06 2.1233: Analyze flue gas for proper air/fuel ratio $5,181 $500 - $5,481
-
MMBtu
$(-300.0)
TOTAL RECOMMENDED $47,285 $3,500 $37,402
504,983
kWh
$11,023
-
MMBtu
$(-1,140.0)
TOTAL IMPLEMENTED $5,456 - $6,296
20,223
kWh
- $(-840.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs