ITAC Assessment: OK0758
ITAC logo
ITAC Assessment: OK0758
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product Valves, Meters, Mixing Products
NAICS 332911: Industrial Valve Manufacturing
SIC 3491: Industrial Valves
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 55,000
ft2
Annual Production 10,000
pieces
Production Hrs. Annual 2,875
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,994 1,220,000
kWh
Natural Gas $12,468 2,711
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $16,406 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,305

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7425: Clean or color roof to reduce solar load $4,272 $20,990 $4,272
56,054
kWh
-
02 2.7491: Insulate glazing, walls, ceilings, and roofs $1,470 $6,841 - $1,470
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $5,699 $51,819 $5,699
67,594
kWh
-
04 2.2437: Recover waste heat from equipment $215 $1,762 - $215
-
MMBtu
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,290 $1,000 $3,290
62,847
kWh
-
06 2.4221: Install compressor air intakes in coolest locations $144 $754 $144
1,890
kWh
-
07 2.1233: Analyze flue gas for proper air/fuel ratio $1,316 $600 - $1,316
-
MMBtu
TOTAL RECOMMENDED $16,406 $83,766 $13,405
188,385
kWh
$3,001
-
MMBtu
TOTAL IMPLEMENTED $10,305 $53,419 $8,989
130,441
kWh
$1,316
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs