ITAC Assessment: OK0747
ITAC logo
ITAC Assessment: OK0747
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Foam for commercial and industrial applications
NAICS 337121: Upholstered Household Furniture Manufacturing
SIC 2515: Mattresses, Foundations, and Convertible Beds
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 400,000
ft2
Annual Production 2,246,400
units
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $215,611 4,190,000
kWh
Electricity Demand $84,102 9,903
kW-mo/yr
Natural Gas $134,769 11,949
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,960 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,165

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $7,165 $4,559 - - - $7,165
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $991 $326 $991
12,605
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $1,756 - $1,756
22,344
kWh
- - -
04 2.3131: Reschedule plant operations or reduce load to avoid peaks $7,099 - - $7,099
-
kW-mo/yr
- -
05 2.9113: Use solar heat for heat $14,978 $138,320 - - - $14,978
-
MMBtu
06 2.7145: Install skylights $22,903 $139,000 $22,903
291,393
kWh
- - -
07 4.611: Begin a practice of predictive / preventative maintenance $2,068 $200 - - $2,068 -
TOTAL RECOMMENDED $56,960 $282,405 $25,650
326,342
kWh
$7,099
-
kW-mo/yr
$2,068 $22,143
-
MMBtu
TOTAL IMPLEMENTED $7,165 $4,559 - - - $7,165
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs