ITAC Assessment: OK0743
ITAC logo
ITAC Assessment: OK0743
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Flex package for meat products
NAICS 333993: Packaging Machinery Manufacturing
SIC 3565: Packaging Machinery
Sales Range $10
M
to 50
M
# of Employees 34
Plant Area 110,000
ft2
Annual Production 450
units
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $238,820 4,821,600
kWh
Electricity Demand $53,416 9,300
kW-mo/yr
Electricity Fees $19,159 -
Natural Gas $24,345 1,858
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $80,782 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,175

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.2437: Recover waste heat from equipment $22,720 $5,010 - $22,720
-
MMBtu
02 2.4221: Install compressor air intakes in coolest locations $2,189 $569 $2,189
42,486
kWh
-
03 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $642 $6,000 $642
12,960
kWh
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,598 $3,500 $3,598
72,701
kWh
-
05 2.7135: Install occupancy sensors $21,613 $2,450 $21,613
436,626
kWh
-
06 2.2622: Replace existing chiller with high efficiency model $24,607 - $24,607
394,200
kWh
-
07 2.2511: Insulate bare equipment $5,413 $723 $5,413
109,245
kWh
-
TOTAL RECOMMENDED $80,782 $18,252 $58,062
1,068,218
kWh
$22,720
-
MMBtu
TOTAL IMPLEMENTED $56,175 $18,252 $33,455
674,018
kWh
$22,720
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs