| Assessment Year | 2007 |
|---|---|
| Principal Product | Flex package for meat products |
| NAICS | 333993: Packaging Machinery Manufacturing |
| SIC | 3565: Packaging Machinery |
| Sales Range | $10 M to 50M |
| # of Employees | 34 |
| Plant Area |
110,000
ft2
|
| Annual Production | 450
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $238,820 | 4,821,600 |
kWh
|
$0.050 |
| Electricity Demand | $53,416 | 9,300 |
kW-mo/yr
|
$5.74 |
| Electricity Fees | $19,159 | - |
|
- |
| Natural Gas | $24,345 | 1,858 |
MMBtu
|
$13.10 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $80,782 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $56,175 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $22,720 | $5,010 | - |
$22,720
-
MMBtu
|
|
| 02 | 2.4221: Install compressor air intakes in coolest locations | $2,189 | $569 |
$2,189
42,486
kWh
|
- | |
| 03 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $642 | $6,000 |
$642
12,960
kWh
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,598 | $3,500 |
$3,598
72,701
kWh
|
- | |
| 05 | 2.7135: Install occupancy sensors | $21,613 | $2,450 |
$21,613
436,626
kWh
|
- | |
| 06 | 2.2622: Replace existing chiller with high efficiency model | $24,607 | - |
$24,607
394,200
kWh
|
- | |
| 07 | 2.2511: Insulate bare equipment | $5,413 | $723 |
$5,413
109,245
kWh
|
- | |
| TOTAL RECOMMENDED | $80,782 | $18,252 |
$58,062
1,068,218
kWh
|
$22,720
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $56,175 | $18,252 |
$33,455
674,018
kWh
|
$22,720
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs