ITAC Assessment: OK0741
ITAC logo
ITAC Assessment: OK0741
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Aerospace structural components
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 150,000
ft2
Annual Production 70,000
pieces
Production Hrs. Annual 4,732
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $153,250 4,081,527
kWh
Electricity Demand $88,055 10,876
kW-mo/yr
Natural Gas $58,251 6,734
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $164,435 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7425: Clean or color roof to reduce solar load $144,120 $500,000 $144,120
1,913,950
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $9,666 $860 $9,666
128,367
kWh
-
03 2.2437: Recover waste heat from equipment $8,334 $7,480 - $8,334
-
MMBtu
04 2.1321: Replace fossil fuel equipment with electrical equipment $2,042 $6,800 - $2,042
-
MMBtu
05 2.6232: Install set-back timers $273 $248 - $273
-
MMBtu
TOTAL RECOMMENDED $164,435 $515,388 $153,786
2,042,317
kWh
$10,649
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs