| Assessment Year | 2006 |
|---|---|
| Principal Product | Poultry Products |
| NAICS | 311615: Poultry Processing |
| SIC | 2015: Poultry Slaughtering and Processing |
| Sales Range | $100 M to 500M |
| # of Employees | 410 |
| Plant Area |
230,000
ft2
|
| Annual Production | 400,000,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Arkansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $531,643 | 15,499,800 |
kWh
|
$0.034 |
| Electricity Demand | $335,070 | 33,608 |
kW-mo/yr
|
$9.97 |
| Natural Gas | $576,759 | 81,925 |
MMBtu
|
$7.04 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $149,917 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4234: Cool compressor air intake with heat exchanger | $1,838 | $2,305 |
$1,204
33,072
kWh
|
$634
-
kW-mo/yr
|
- | |
| 02 | 2.6231: Utilize controls to operate equipment only when needed | $11,412 | $13,554 |
$7,475
205,369
kWh
|
$3,937
-
kW-mo/yr
|
- | |
| 03 | 2.2511: Insulate bare equipment | $2,127 | $339 | - | - |
$2,127
-
MMBtu
|
|
| 04 | 2.2414: Use waste heat from hot flue gases to preheat | $21,283 | $32,000 | - | - |
$21,283
-
MMBtu
|
|
| 05 | 2.2441: Preheat boiler makeup water with waste process heat | $18,769 | $16,500 | - | - |
$18,769
-
MMBtu
|
|
| 06 | 2.1231: Establish burner maintenance schedule for boilers | $31,992 | $32,500 | - | - |
$31,992
-
MMBtu
|
|
| 07 | 2.2437: Recover waste heat from equipment | $55,348 | $35,269 | - | - |
$55,348
-
MMBtu
|
|
| 08 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,168 | $8,723 |
$3,168
91,020
kWh
|
- | - | |
| 09 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $579 | $2,006 |
$579
16,351
kWh
|
- | - | |
| 10 | 2.7135: Install occupancy sensors | $1,213 | $331 |
$1,213
34,265
kWh
|
- | - | |
| 11 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,188 | $5,750 | - |
$2,188
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $149,917 | $149,277 |
$13,639
380,077
kWh
|
$6,759
-
kW-mo/yr
|
$129,519
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs