ITAC Assessment: ME0202
ITAC logo
ITAC Assessment: ME0202
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Wooden Reels
NAICS
n/a
SIC 2499: Wood Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 170
Plant Area 12,180
ft2
Annual Production 390,000
pieces
Production Hrs. Annual 4,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $301,022 5,083,529
kWh
Electricity Demand $106,347 16,707
kW-mo/yr
Electricity Fees $6,067 -
Wood $11,610 3,339
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $15,706 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,706

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Wood Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,316 - $4,215
60,082
kWh
$1,101
-
kW-mo/yr
- - - - - -
02 2.8123: Pay utility bills on time $2,884 - - - - - - $2,884 - -
03 2.4221: Install compressor air intakes in coolest locations $1,211 - $1,211
17,292
kWh
- - - - - - -
04 4.452: Eliminate shift $1,125 - - - - - - $1,125 - -
05 2.8121: Apply for tax-free status for energy purchases $1,071 - - - - - - $1,071 - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,030 $2,544 $374
6,155
kWh
$119
-
kW-mo/yr
- - $153 - $384 -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $856 - $856
14,361
kWh
- - - - - - -
08 2.2511: Insulate bare equipment $455 - - - $455
-
MMBtu
- - - - -
09 2.2153: Close off unneeded steam lines $346 - - - $346
-
MMBtu
- - - - -
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $313 - $313
4,396
kWh
- - - - - - -
11 2.2136: Install / repair insulation on steam lines $302 - - - $302
-
MMBtu
- - - - -
12 2.2511: Insulate bare equipment $264 - - - $264
-
MMBtu
- - - - -
13 2.8121: Apply for tax-free status for energy purchases $105 - - - - - - $105 - -
14 2.8121: Apply for tax-free status for energy purchases $133 - - - - - - $133 - -
15 3.4154: Eliminate leaks in water lines and valves $295 - - - $132
-
MMBtu
$45
-
Tgal
- - - $118
-
Tgal
TOTAL RECOMMENDED $15,706 $2,544 $6,969
102,286
kWh
$1,220
-
kW-mo/yr
$1,499
-
MMBtu
$45
-
Tgal
$153 $5,318 $384 $118
-
Tgal
TOTAL IMPLEMENTED $15,706 $2,544 $6,969
102,286
kWh
$1,220
-
kW-mo/yr
$1,499
-
MMBtu
$45
-
Tgal
$153 $5,318 $384 $118
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Wood Savings Water Disposal Savings Personnel Changes Savings Administrative Changes Savings Ancillary Material Cost Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs