ITAC Assessment: OK0714
ITAC logo
ITAC Assessment: OK0714
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Winches for Vehicles and Cranes
NAICS 333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing
SIC 3531: Construction Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 250
Plant Area 210,000
ft2
Annual Production 1,600
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $239,108 6,043,800
kWh
Electricity Demand $110,165 18,299
kW-mo/yr
Electricity Fees $6,431 -
Natural Gas $72,510 9,315
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $151,759 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $79,678

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3137: Use power during off-peak periods $1,866 - - $1,866
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $56,721 $117,780 $45,895
1,158,955
kWh
$13,417
-
kW-mo/yr
- - $(-2,591.0)
03 2.4227: Use compressor air filters $4,058 $920 $4,259
107,555
kWh
$87
-
kW-mo/yr
- $(-288.0) -
04 2.7241: Install outside air damper / economizer on hvac unit $8,299 $70 $8,299
209,573
kWh
- - - -
05 4.611: Begin a practice of predictive / preventative maintenance $10,600 - - - - $10,600 -
06 4.131: Modify process to reduce material use/cost $70,215 $3,931 - $325
-
kW-mo/yr
$570
-
lb
$15,960 $53,360
TOTAL RECOMMENDED $151,759 $122,701 $58,453
1,476,083
kWh
$15,695
-
kW-mo/yr
$570
-
lb
$26,272 $50,769
TOTAL IMPLEMENTED $79,678 $118,770 $58,453
1,476,083
kWh
$13,504
-
kW-mo/yr
- $10,312 $(-2,591.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings