Assessment Year | 2005 |
---|---|
Principal Product | Solvent based coating |
NAICS | 325510: Paint and Coating Manufacturing |
SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
100,000
ft2
|
Annual Production | 2,800
Tgal
|
Production Hrs. Annual | 2,600
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $83,698 | 1,202,790 |
kWh
|
$0.070 |
Electricity Demand | $2,521 | 308 |
kW-mo/yr
|
$8.19 |
Electricity Fees | $16,283 | - |
|
- |
Natural Gas | $145,603 | 21,542 |
MMBtu
|
$6.76 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,875 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $3,684 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3137: Use power during off-peak periods | $2,560 | - |
$2,560
-
kWh
|
- | - | - | |
02 | 2.2511: Insulate bare equipment | $3,684 | $1,030 | - |
$3,684
-
MMBtu
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,659 | $11,363 |
$1,943
23,603
kWh
|
- | $(-284.0) | - | |
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $11,493 | $21,700 |
$11,493
139,651
kWh
|
- | - | - | |
05 | 4.611: Begin a practice of predictive / preventative maintenance | $1,000 | - | - | - | $1,000 | - | |
06 | 2.6232: Install set-back timers | $4,055 | $2,205 | - |
$4,055
-
MMBtu
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,077 | $4,640 |
$1,077
13,092
kWh
|
- | - | - | |
08 | 2.2437: Recover waste heat from equipment | $541 | $3,034 | - |
$541
-
MMBtu
|
- | - | |
09 | 2.7135: Install occupancy sensors | $824 | $1,820 |
$824
10,009
kWh
|
- | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $127 | $109 |
$124
1,508
kWh
|
- | - | $3 | |
11 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $159 | $1,000 |
$209
2,538
kWh
|
- | - | $(-50.0) | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $696 | $4,181 |
$655
7,952
kWh
|
- | $41 | - | |
TOTAL RECOMMENDED | $27,875 | $51,082 |
$18,885
198,353
kWh
|
$8,280
-
MMBtu
|
$757 | $(-47.0) | ||
TOTAL IMPLEMENTED | $3,684 | $1,030 | - |
$3,684
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs