ITAC Assessment: OK0709
ITAC logo
ITAC Assessment: OK0709
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Solvent based coating
NAICS 325510: Paint and Coating Manufacturing
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 85
Plant Area 100,000
ft2
Annual Production 2,800
Tgal
Production Hrs. Annual 2,600
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $83,698 1,202,790
kWh
Electricity Demand $2,521 308
kW-mo/yr
Electricity Fees $16,283 -
Natural Gas $145,603 21,542
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,875 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,684

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3137: Use power during off-peak periods $2,560 - $2,560
-
kWh
- - -
02 2.2511: Insulate bare equipment $3,684 $1,030 - $3,684
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,659 $11,363 $1,943
23,603
kWh
- $(-284.0) -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,493 $21,700 $11,493
139,651
kWh
- - -
05 4.611: Begin a practice of predictive / preventative maintenance $1,000 - - - $1,000 -
06 2.6232: Install set-back timers $4,055 $2,205 - $4,055
-
MMBtu
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,077 $4,640 $1,077
13,092
kWh
- - -
08 2.2437: Recover waste heat from equipment $541 $3,034 - $541
-
MMBtu
- -
09 2.7135: Install occupancy sensors $824 $1,820 $824
10,009
kWh
- - -
10 2.7142: Utilize higher efficiency lamps and/or ballasts $127 $109 $124
1,508
kWh
- - $3
11 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $159 $1,000 $209
2,538
kWh
- - $(-50.0)
12 2.7142: Utilize higher efficiency lamps and/or ballasts $696 $4,181 $655
7,952
kWh
- $41 -
TOTAL RECOMMENDED $27,875 $51,082 $18,885
198,353
kWh
$8,280
-
MMBtu
$757 $(-47.0)
TOTAL IMPLEMENTED $3,684 $1,030 - $3,684
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs