ITAC Assessment: OK0707
ITAC logo
ITAC Assessment: OK0707
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Custom Printed Envelopes
NAICS 322230: Stationery Product Manufacturing
SIC 2677: Envelopes
Sales Range $10
M
to 50
M
# of Employees 104
Plant Area 50,000
ft2
Annual Production 850,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,632 4,717,884
kWh
Electricity Demand $41,691 10,182
kW-mo/yr
Electricity Fees $67,489 -
Natural Gas $15,588 1,524
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $23,741 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $8,210

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7491: Insulate glazing, walls, ceilings, and roofs $4,316 $7,739 $590
12,309
kWh
$106
-
kW-mo/yr
$620
-
MMBtu
$3,000
02 2.2437: Recover waste heat from equipment $5,571 $25,675 - - $5,571
-
MMBtu
-
03 2.6232: Install set-back timers $4,532 $1,380 - - $4,532
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,916 $617 $4,437
92,638
kWh
$729
-
kW-mo/yr
- $(-250.0)
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,639 $6,750 $2,201
45,906
kWh
$438
-
kW-mo/yr
- -
06 2.3191: Use demand controller or load shedder $1,173 $6,405 - $1,173
-
kW-mo/yr
- -
07 2.7135: Install occupancy sensors $594 $626 $594
12,397
kWh
- - -
TOTAL RECOMMENDED $23,741 $49,192 $7,822
163,250
kWh
$2,446
-
kW-mo/yr
$10,723
-
MMBtu
$2,750
TOTAL IMPLEMENTED $8,210 $32,425 $2,201
45,906
kWh
$438
-
kW-mo/yr
$5,571
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs