Assessment Year | 2005 |
---|---|
Principal Product | Food preparation and distribution |
NAICS | 311999: All Other Miscellaneous Food Manufacturing |
SIC | 2099: Food Preparations, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 75 |
Plant Area |
100,000
ft2
|
Annual Production | 1,200,000
pieces
|
Production Hrs. Annual | 7,072
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $106,865 | 2,629,104 |
kWh
|
$0.041 |
Electricity Demand | $41,332 | 5,435 |
kW-mo/yr
|
$7.60 |
Electricity Fees | $15,675 | - |
|
- |
Natural Gas | $12,679 | 1,509 |
MMBtu
|
$8.40 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,370 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $17,251 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.3191: Use demand controller or load shedder | $10,579 | $1,500 | - |
$10,579
-
kW-mo/yr
|
- | - | - | |
02 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $6,672 | $13,451 |
$5,058
125,194
kWh
|
$1,614
-
kW-mo/yr
|
- | - | - | |
03 | 2.6232: Install set-back timers | $4,084 | $1,468 | - | - |
$4,084
-
MMBtu
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,296 | $2,239 |
$3,964
98,112
kWh
|
$1,021
-
kW-mo/yr
|
- | - | $7,311 | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,610 | $10,437 |
$626
15,495
kWh
|
$453
-
kW-mo/yr
|
- | - | $531 | |
06 | 2.7135: Install occupancy sensors | $1,308 | $802 |
$1,308
32,388
kWh
|
- | - | - | - | |
07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $821 | $605 |
$103
2,540
kWh
|
$26
-
kW-mo/yr
|
- | $188 | $504 | |
TOTAL RECOMMENDED | $37,370 | $30,502 |
$11,059
273,729
kWh
|
$13,693
-
kW-mo/yr
|
$4,084
-
MMBtu
|
$188 | $8,346 | ||
TOTAL IMPLEMENTED | $17,251 | $14,951 |
$5,058
125,194
kWh
|
$12,193
-
kW-mo/yr
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs