ITAC Assessment: OK0706
ITAC logo
ITAC Assessment: OK0706
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Food preparation and distribution
NAICS 311999: All Other Miscellaneous Food Manufacturing
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 75
Plant Area 100,000
ft2
Annual Production 1,200,000
pieces
Production Hrs. Annual 7,072
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $106,865 2,629,104
kWh
Electricity Demand $41,332 5,435
kW-mo/yr
Electricity Fees $15,675 -
Natural Gas $12,679 1,509
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $37,370 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,251

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.3191: Use demand controller or load shedder $10,579 $1,500 - $10,579
-
kW-mo/yr
- - -
02 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $6,672 $13,451 $5,058
125,194
kWh
$1,614
-
kW-mo/yr
- - -
03 2.6232: Install set-back timers $4,084 $1,468 - - $4,084
-
MMBtu
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $12,296 $2,239 $3,964
98,112
kWh
$1,021
-
kW-mo/yr
- - $7,311
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,610 $10,437 $626
15,495
kWh
$453
-
kW-mo/yr
- - $531
06 2.7135: Install occupancy sensors $1,308 $802 $1,308
32,388
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $821 $605 $103
2,540
kWh
$26
-
kW-mo/yr
- $188 $504
TOTAL RECOMMENDED $37,370 $30,502 $11,059
273,729
kWh
$13,693
-
kW-mo/yr
$4,084
-
MMBtu
$188 $8,346
TOTAL IMPLEMENTED $17,251 $14,951 $5,058
125,194
kWh
$12,193
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs