| Assessment Year | 2005 |
|---|---|
| Principal Product | Ice cream |
| NAICS | 311520: Ice Cream and Frozen Dessert Manufacturing |
| SIC | 2024: Ice Cream and Frozen Desserts |
| Sales Range | $10 M to 50M |
| # of Employees | 150 |
| Plant Area |
140,946
ft2
|
| Annual Production | 8,000
Tgal
|
| Production Hrs. Annual | 3,120
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $372,500 | 10,132,500 |
kWh
|
$0.037 |
| Electricity Demand | $158,066 | 27,062 |
kW-mo/yr
|
$5.84 |
| Electricity Fees | $10,217 | - |
|
- |
| Natural Gas | $174,084 | 33,022 |
MMBtu
|
$5.27 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $41,418 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2441: Preheat boiler makeup water with waste process heat | $7,257 | $5,175 | - | - |
$2,017
-
MMBtu
|
$2,248
-
Tgal
|
- | - |
$2,992
-
Tgal
|
|
| 02 | 2.1212: Operate boilers on high fire setting | $4,358 | $1,436 | - | - |
$4,358
-
MMBtu
|
- | - | - | - | |
| 03 | 2.7135: Install occupancy sensors | $820 | $688 |
$820
22,277
kWh
|
- | - | - | - | - | - | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,912 | $8,734 |
$1,505
40,909
kWh
|
$974
-
kW-mo/yr
|
- | - | - | $1,433 | - | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,011 | $2,257 |
$469
12,755
kWh
|
$108
-
kW-mo/yr
|
- | - | $780 | $2,654 | - | |
| 06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $9,769 | $11,310 | - | - |
$9,769
-
MMBtu
|
- | - | - | - | |
| 07 | 4.611: Begin a practice of predictive / preventative maintenance | $8,000 | - | - | - | - | - | $8,000 | - | - | |
| 08 | 2.6232: Install set-back timers | $1,663 | $20 | - | - |
$1,663
-
MMBtu
|
- | - | - | - | |
| 09 | 2.6231: Utilize controls to operate equipment only when needed | $1,463 | $13,554 |
$887
24,097
kWh
|
$576
-
kW-mo/yr
|
- | - | - | - | - | |
| 10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $165 | $1,153 |
$161
4,379
kWh
|
$30
-
kW-mo/yr
|
- | - | - | $(-26.0) | - | |
| TOTAL RECOMMENDED | $41,418 | $44,327 |
$3,842
104,417
kWh
|
$1,688
-
kW-mo/yr
|
$17,807
-
MMBtu
|
$2,248
-
Tgal
|
$8,780 | $4,061 |
$2,992
-
Tgal
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Water Consumption Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs