ITAC Assessment: OK0702
ITAC logo
ITAC Assessment: OK0702
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Industrial and Automotive Gasket
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 254
Plant Area 80,000
ft2
Annual Production 40,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $297,737 11,991,000
kWh
Electricity Demand $157,950 26,660
kW-mo/yr
Electricity Fees $151,959 -
Natural Gas $1,790 164
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $50,686 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $234

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
01 3.5218: Reuse / recycle/ sell rubber products $22,000 $6,600 - - - $22,000
-
lb
- -
02 2.3137: Use power during off-peak periods $21,518 $6,899 - $21,518
-
kW-mo/yr
- - - -
03 2.7135: Install occupancy sensors $1,148 $582 $546
22,022
kWh
$602
-
kW-mo/yr
- - - -
04 2.6232: Install set-back timers $896 $1,540 - - $896
-
MMBtu
- - -
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $234 $530 $334
13,463
kWh
- - - $(-100.0) -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $725 $480 $202
8,273
kWh
$66
-
kW-mo/yr
- - $180 $277
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $4,165 $36,140 - $4,165
-
kW-mo/yr
- - - -
TOTAL RECOMMENDED $50,686 $52,771 $1,082
43,758
kWh
$26,351
-
kW-mo/yr
$896
-
MMBtu
$22,000
-
lb
$80 $277
TOTAL IMPLEMENTED $234 $530 $334
13,463
kWh
- - - $(-100.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs