ITAC Assessment: OK0699
ITAC logo
ITAC Assessment: OK0699
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Wiring Harnesses
NAICS 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $5
M
to 10
M
# of Employees 123
Plant Area 55,000
ft2
Annual Production 14,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $21,759 710,054
kWh
Electricity Demand $26,776 2,759
kW-mo/yr
Natural Gas $18,649 2,464
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $38,512 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,512

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 4.652: Replace existing equipment with more suitable substitutes $9,780 $6,150 $680
22,233
kWh
- - $9,100 -
02 2.7229: Air condition only space necessary $8,145 $24,175 $4,832
157,918
kWh
$3,313
-
kW-mo/yr
- - -
03 2.7241: Install outside air damper / economizer on hvac unit $5,446 $23,400 $5,446
177,986
kWh
- - - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $3,440 $18,681 $1,216
39,728
kWh
$2,224
-
kW-mo/yr
- - -
05 2.6232: Install set-back timers $6,489 $3,960 - - $6,489
-
MMBtu
- -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $418 $520 $418
13,645
kWh
- - - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $324 $707 $117
3,810
kWh
$51
-
kW-mo/yr
- - $156
08 2.8118: Check for accuracy of utility / power meters $4,470 - - - $4,470
-
MMBtu
- -
TOTAL RECOMMENDED $38,512 $77,593 $12,709
415,320
kWh
$5,588
-
kW-mo/yr
$10,959
-
MMBtu
$9,100 $156
TOTAL IMPLEMENTED $38,512 $77,593 $12,709
415,320
kWh
$5,588
-
kW-mo/yr
$10,959
-
MMBtu
$9,100 $156
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs