Assessment Year | 2004 |
---|---|
Principal Product | Wet-formed fiberglass material |
NAICS | 327212: Other Pressed and Blown Glass and Glassware Manufacturing |
SIC | 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 75 |
Plant Area |
72,700
ft2
|
Annual Production | 44,500
thousand feet
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $398,550 | 13,440,000 |
kWh
|
$0.030 |
Electricity Demand | $87,832 | 20,178 |
kW-mo/yr
|
$4.35 |
Electricity Fees | $17,465 | - |
|
- |
Natural Gas | $1,916,769 | 265,661 |
MMBtu
|
$7.22 |
Other Gas | $49,840 | 37,798 |
MMBtu
|
$1.32 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $631,952 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,031 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $585,281 | $30,200 | - | - | - |
$585,281
-
MMBtu
|
- | - | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $28,651 | $88,297 |
$28,651
964,680
kWh
|
- | - | - | - | - | |
03 | 2.3212: Optimize plant power factor | $7,010 | $10,720 | n/a | - | - | $7,010 | - | - | - |
04 | 2.2612: Use cooling tower water instead of refrigeration | $2,179 | $3,635 |
$1,170
39,410
kWh
|
$1,009
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,903 | $31,913 |
$2,773
93,382
kWh
|
$513
-
kW-mo/yr
|
- | - | $243 | $2,374 | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $808 | $123 |
$683
22,995
kWh
|
$125
-
kW-mo/yr
|
- | - | - | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $992 | $1,025 |
$838
28,231
kWh
|
$154
-
kW-mo/yr
|
- | - | - | - | |
08 | 2.7261: Install timers and/or thermostats | $772 | $1,140 | - | - | - |
$772
-
MMBtu
|
- | - | |
09 | 2.7135: Install occupancy sensors | $356 | $737 |
$356
11,981
kWh
|
- | - | - | - | - | |
TOTAL RECOMMENDED | $631,952 | $167,790 |
$34,471
1,160,679
kWh
|
$1,801
-
kW-mo/yr
|
$7,010 |
$586,053
-
MMBtu
|
$243 | $2,374 | ||
TOTAL IMPLEMENTED | $7,031 | $33,790 |
$3,129
105,363
kWh
|
$513
-
kW-mo/yr
|
- |
$772
-
MMBtu
|
$243 | $2,374 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs