Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Ashphalt and Aggregates
NAICS 324121: Asphalt Paving Mixture and Block Manufacturing
SIC 2951: Asphalt Paving Mixtures and Blocks
Sales Range $10
M
to 50
M
# of Employees 350
Plant Area 1,000,000
ft2
Annual Production 2,650
ton
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $341,473 7,098,148
kWh
Electricity Demand $41,710 49,927
kW-mo/yr
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $125,325 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $125,325

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Personnel Changes Savings
01 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $38,252 $21,080 $38,252
708,375
kWh
- - - -
02 2.7135: Install occupancy sensors $292 $706 $292
5,408
kWh
- - - -
03 2.6232: Install set-back timers $2,316 $400 - - - $2,316
-
MMBtu
-
04 2.7135: Install occupancy sensors $8,325 $800 $5,189
96,096
kWh
$1,136
-
kW-mo/yr
- - $2,000
05 4.611: Begin a practice of predictive / preventative maintenance $2,000 - - - - - $2,000
06 2.8114: Change rate schedules or other changes in utility service $74,140 $1,000 - - $74,140 - -
TOTAL RECOMMENDED $125,325 $23,986 $43,733
809,879
kWh
$1,136
-
kW-mo/yr
$74,140 $2,316
-
MMBtu
$4,000
TOTAL IMPLEMENTED $125,325 $23,986 $43,733
809,879
kWh
$1,136
-
kW-mo/yr
$74,140 $2,316
-
MMBtu
$4,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Fuel Oil #2 Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs