Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Plastic Cups and Plates
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 120
Plant Area 176,800
ft2
Annual Production 6,800,000
pieces
Production Hrs. Annual 8,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $981,377 26,641,599
kWh
Natural Gas $25,433 3,603
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $415,881 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4224: Upgrade controls on compressors $19,254 $25,000 $19,254
523,200
kWh
- -
02 2.4227: Use compressor air filters $4,163 $130 $4,611
125,304
kWh
- $(-448.0)
03 2.2625: Chill water to the highest temperature possible $10,131 $11,350 $10,131
275,309
kWh
- -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,342 $10,540 n/a $3,342
90,817
kWh
- -
05 4.426: Modify workload $378,991 $200,000 $48,991
1,331,287
kWh
$330,000 -
TOTAL RECOMMENDED $415,881 $247,020 $86,329
2,345,917
kWh
$330,000 $(-448.0)
TOTAL IMPLEMENTED - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs