| Assessment Year | 1992 |
|---|---|
| Principal Product | ELECTRICAL CONNECTORS |
| NAICS |
n/a
|
| SIC | 3678: Electronic Connectors |
| Sales Range | $100 M to 500M |
| # of Employees | 500 |
| Plant Area |
n/a
|
| Annual Production | 2,400,000
lb
|
| Production Hrs. Annual | 6,240
hrs
|
| Location (State) | Missouri |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $1,545,423 | 28,359,320 |
kWh
|
$0.054 |
| Natural Gas | $240,240 | 77,161 |
MMBtu
|
$3.11 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $19,922 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $11,314 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.4133: Use most efficient type of electric motors | $2,525 | $29,000 |
$2,525
46,307
kWh
|
- | - | |
| 02 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,501 | $450 |
$3,501
64,185
kWh
|
- | - | |
| 03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,641 | $5,145 | - |
$3,641
-
MMBtu
|
- | |
| 04 | 2.4312: Improve lubrication practices | $4,967 | $587 |
$4,967
91,149
kWh
|
- | - | |
| 05 | 2.4221: Install compressor air intakes in coolest locations | $2,541 | $1,300 |
$2,541
46,600
kWh
|
- | - | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,853 | $760 |
$2,074
38,101
kWh
|
- | $(-221.0) | |
| 07 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $894 | $3,500 |
$894
16,413
kWh
|
- | - | |
| TOTAL RECOMMENDED | $19,922 | $40,742 |
$16,502
302,755
kWh
|
$3,641
-
MMBtu
|
$(-221.0) | ||
| TOTAL IMPLEMENTED | $11,314 | $35,010 |
$11,535
211,606
kWh
|
- | $(-221.0) | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs