Assessment Year | 2003 |
---|---|
Principal Product | Winches and Speed Reducer |
NAICS | 333923: Overhead Traveling Crane, Hoist, and Monorail System Manufacturing |
SIC | 3531: Construction Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 85 |
Plant Area |
80,000
ft2
|
Annual Production | 18,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $74,273 | 1,584,300 |
kWh
|
$0.047 |
Electricity Fees | $1,425 | - |
|
- |
Natural Gas | $8,952 | 1,150 |
MMBtu
|
$7.78 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $90,833 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,010 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $274 | $256 |
$168
5,265
kWh
|
$106
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
02 | 2.7135: Install occupancy sensors | $124 | $231 |
$124
3,890
kWh
|
- | - | - | - | - | - | - | - | |
03 | 2.7241: Install outside air damper / economizer on hvac unit | $4,171 | $2,000 |
$4,171
130,342
kWh
|
- | - | - | - | - | - | - | - | |
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,210 | $2,000 | - |
$2,210
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $565 | $367 |
$473
14,788
kWh
|
$188
-
kW-mo/yr
|
- | - | - | - | $(-96.0) | - | - | |
06 | 2.3212: Optimize plant power factor | $428 | $2,730 | - | - | $428 | - | - | - | - | - | - | |
07 | 2.2437: Recover waste heat from equipment | $4,672 | $2,173 | - | - | - |
$4,672
-
MMBtu
|
- | - | - | - | - | |
08 | 2.6232: Install set-back timers | $1,993 | - | - | - | - |
$1,993
-
MMBtu
|
- | - | - | - | - | |
09 | 3.5146: Utilize a central coolant system for cleaning and reuse of metal working fluid | $14,350 | $23,640 | - | - | - | - | - |
$5,856
-
gal
|
- | $8,494 | - | |
10 | 2.7141: Lower light fixtures in high ceiling areas | $61,378 | $3,000 | - | - | - | - | - | - | - | - | $61,378 | |
11 | 3.4116: Meter recycled water (to reduce sewer charges) | $668 | $287 | - | - | - | - |
$668
-
Tgal
|
- | - | - | - | |
TOTAL RECOMMENDED | $90,833 | $36,684 |
$4,936
154,285
kWh
|
$2,504
-
kW-mo/yr
|
$428 |
$6,665
-
MMBtu
|
$668
-
Tgal
|
$5,856
-
gal
|
$(-96.0) | $8,494 | $61,378 | ||
TOTAL IMPLEMENTED | $5,010 | $2,623 |
$4,812
150,395
kWh
|
$294
-
kW-mo/yr
|
- | - | - | - | $(-96.0) | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Water Disposal Savings | Other Liquid (non-haz) Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs