ITAC Assessment: OK0668
ITAC logo
ITAC Assessment: OK0668
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Toner
NAICS 325992: Photographic Film, Paper, Plate, and Chemical Manufacturing
SIC 3861: Photographic Equipment and Supplies
Sales Range $50
M
to 100
M
# of Employees 180
Plant Area 850,000
ft2
Annual Production 15,000,000
lb
Production Hrs. Annual 8,760
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $2,120,162 89,640,000
kWh
Electricity Demand $1,097,003 160,134
kW-mo/yr
Electricity Fees $89,455 -
Natural Gas $884,739 188,529
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $323,719 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $163,185

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $26,150 $61,955 $20,969
884,760
kWh
$6,408
-
kW-mo/yr
- - $(-1,227.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $25,013 $38,456 $7,235
305,269
kWh
$2,220
-
kW-mo/yr
- $15,558 -
03 2.7135: Install occupancy sensors $6,113 $1,885 $6,113
257,929
kWh
- - - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,597 - $3,370
142,200
kWh
$1,027
-
kW-mo/yr
- $(-800.0) -
05 2.3131: Reschedule plant operations or reduce load to avoid peaks $67,238 - - $67,238
-
kW-mo/yr
- - -
06 2.4221: Install compressor air intakes in coolest locations $21,821 $1,125 $16,713
705,180
kWh
$5,108
-
kW-mo/yr
- - -
07 2.4234: Cool compressor air intake with heat exchanger $50,260 $51,780 $38,490
1,624,068
kWh
$11,770
-
kW-mo/yr
- - -
08 2.2414: Use waste heat from hot flue gases to preheat $31,772 $9,500 - - $31,772
-
MMBtu
- -
09 2.2511: Insulate bare equipment $1,369 $1,455 - - $1,369
-
MMBtu
- -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,501 $6,296 $3,501
147,759
kWh
- - - -
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $32,447 $112,608 n/a $32,447
1,369,074
kWh
- - - -
12 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $16,404 $34,425 n/a $16,404
692,161
kWh
- - - -
13 2.7311: Ventilation system to shut off when room is not in use $38,034 $1,647 $29,131
1,229,153
kWh
$8,903
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $323,719 $321,132 $174,373
7,357,553
kWh
$102,674
-
kW-mo/yr
$33,141
-
MMBtu
$14,758 $(-1,227.0)
TOTAL IMPLEMENTED $163,185 $44,568 $62,562
2,639,731
kWh
$84,496
-
kW-mo/yr
$1,369
-
MMBtu
$14,758 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs