Assessment Year | 2003 |
---|---|
Principal Product | PVC hose, Tire patches, pneumatic hose fittings and assembly |
NAICS | 332912: Fluid Power Valve and Hose Fitting Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $50 M to 100M |
# of Employees | 175 |
Plant Area |
106,000
ft2
|
Annual Production | 25
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $111,152 | 3,986,400 |
kWh
|
$0.028 |
Electricity Demand | $63,107 | 7,175 |
kW-mo/yr
|
$8.80 |
Electricity Fees | $7,042 | - |
|
- |
Natural Gas | $51,660 | 10,838 |
MMBtu
|
$4.77 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $249,430 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.5111: Convert from indirect to direct fired systems | $15,468 | $30,000 | - |
$15,468
-
MMBtu
|
- | - | - | |
02 | 4.611: Begin a practice of predictive / preventative maintenance | $18,000 | - | - | - | - | $18,000 | - | |
03 | 2.6232: Install set-back timers | $11,925 | $1,200 | - |
$11,925
-
MMBtu
|
- | - | - | |
04 | 2.7135: Install occupancy sensors | $543 | $404 |
$543
20,592
kWh
|
- | - | - | - | |
05 | 2.2136: Install / repair insulation on steam lines | $4,253 | $3,276 | - |
$4,253
-
MMBtu
|
- | - | - | |
06 | 4.513: Re-arrange equipment layout to reduce labor costs | $4,844 | $100 | - | - | - | $4,844 | - | |
07 | 3.1175: Use a different or recycled raw material | $136,157 | $28,500 |
$(-12,643.0)
(-223,800)
kWh
|
- |
$12,500
-
lb
|
$(-5,000.0) | $141,300 | |
08 | 4.424: Improve space comfort conditioning | $58,240 | $20,000 | - | - | - | $58,240 | - | |
TOTAL RECOMMENDED | $249,430 | $83,480 |
$(-12,100.0)
(-203,208)
kWh
|
$31,646
-
MMBtu
|
$12,500
-
lb
|
$76,084 | $141,300 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs