ITAC Assessment: OK0663
ITAC logo
ITAC Assessment: OK0663
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Battered & Breaded Chicken, Charbroil Chicken and Beef
NAICS 311612: Meat Processed from Carcasses
SIC 2013: Sausages and Other Prepared Meat Products
Sales Range $100
M
to 500
M
# of Employees 400
Plant Area 150,000
ft2
Annual Production 60,000,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $467,321 18,604,400
kWh
Electricity Demand $250,168 41,349
kW-mo/yr
Electricity Fees $66,933 -
Natural Gas $536,554 119,680
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,131 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $6,024

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings
01 2.3212: Optimize plant power factor $3,549 $3,270 - $3,549
-
kW-mo/yr
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $830 $5,487 $301
11,997
kWh
$375
-
kW-mo/yr
- $154
03 2.7135: Install occupancy sensors $501 $748 $501
19,945
kWh
- - -
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $55,688 $83,636 $55,688
2,218,640
kWh
- - -
05 2.2511: Insulate bare equipment $2,384 $4,820 - - $2,384
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $1,144 $568 $860
34,272
kWh
$284
-
kW-mo/yr
- -
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $26,035 $2,100 - $26,035
-
kW-mo/yr
- -
TOTAL RECOMMENDED $90,131 $100,629 $57,350
2,284,854
kWh
$30,243
-
kW-mo/yr
$2,384
-
MMBtu
$154
TOTAL IMPLEMENTED $6,024 $10,073 $1,662
66,214
kWh
$4,208
-
kW-mo/yr
- $154
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Ancillary Material Cost Savings