Assessment Year | 2003 |
---|---|
Principal Product | Fan Coil Units |
NAICS | 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen |
SIC | 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment |
Sales Range | $50 M to 100M |
# of Employees | 400 |
Plant Area |
161,000
ft2
|
Annual Production | 90,000
pieces
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $158,791 | 5,446,800 |
kWh
|
$0.029 |
Electricity Demand | $141,120 | 13,402 |
kW-mo/yr
|
$10.53 |
Electricity Fees | $9,907 | - |
|
- |
Natural Gas | $53,403 | 13,224 |
MMBtu
|
$4.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $133,689 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $48,220 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $72,173 | - | - |
$72,173
-
kW-mo/yr
|
- | - | - | - | |
02 | 4.611: Begin a practice of predictive / preventative maintenance | $20,400 | - | - | - | - | - | $6,000 | $14,400 | |
03 | 2.2437: Recover waste heat from equipment | $8,245 | $7,483 | - | - |
$8,245
-
MMBtu
|
- | - | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,319 | $823 |
$2,018
74,476
kWh
|
$1,757
-
kW-mo/yr
|
- | - | $(-456.0) | - | |
05 | 2.3212: Optimize plant power factor | $1,271 | $3,206 | - |
$1,271
-
kW-mo/yr
|
- | - | - | - | |
06 | 2.4227: Use compressor air filters | $3,339 | $168 |
$1,883
69,472
kWh
|
$756
-
kW-mo/yr
|
$1,708
-
MMBtu
|
- | $(-1,008.0) | - | |
07 | 2.7135: Install occupancy sensors | $441 | $262 |
$441
16,286
kWh
|
- | - | - | - | - | |
08 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $13,061 | $45,000 |
$13,061
481,970
kWh
|
- | - | - | - | - | |
09 | 4.513: Re-arrange equipment layout to reduce labor costs | $11,440 | $2,500 | - | - | - | $11,440 | - | - | |
TOTAL RECOMMENDED | $133,689 | $59,442 |
$17,403
642,204
kWh
|
$75,957
-
kW-mo/yr
|
$9,953
-
MMBtu
|
$11,440 | $4,536 | $14,400 | ||
TOTAL IMPLEMENTED | $48,220 | $48,323 |
$15,079
556,446
kWh
|
$1,757
-
kW-mo/yr
|
- | $11,440 | $5,544 | $14,400 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs