ITAC Assessment: OK0661
ITAC logo
ITAC Assessment: OK0661
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Fan Coil Units
NAICS 333415: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipmen
SIC 3585: Air-Conditioning and Warm Air Heating Equipment and Commercial and Industrial Refrigeration Equipment
Sales Range $50
M
to 100
M
# of Employees 400
Plant Area 161,000
ft2
Annual Production 90,000
pieces
Production Hrs. Annual 4,160
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,791 5,446,800
kWh
Electricity Demand $141,120 13,402
kW-mo/yr
Electricity Fees $9,907 -
Natural Gas $53,403 13,224
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $133,689 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,220

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
01 2.3131: Reschedule plant operations or reduce load to avoid peaks $72,173 - - $72,173
-
kW-mo/yr
- - - -
02 4.611: Begin a practice of predictive / preventative maintenance $20,400 - - - - - $6,000 $14,400
03 2.2437: Recover waste heat from equipment $8,245 $7,483 - - $8,245
-
MMBtu
- - -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,319 $823 $2,018
74,476
kWh
$1,757
-
kW-mo/yr
- - $(-456.0) -
05 2.3212: Optimize plant power factor $1,271 $3,206 - $1,271
-
kW-mo/yr
- - - -
06 2.4227: Use compressor air filters $3,339 $168 $1,883
69,472
kWh
$756
-
kW-mo/yr
$1,708
-
MMBtu
- $(-1,008.0) -
07 2.7135: Install occupancy sensors $441 $262 $441
16,286
kWh
- - - - -
08 2.2614: Use cooling tower or economizer to replace chiller cooling $13,061 $45,000 $13,061
481,970
kWh
- - - - -
09 4.513: Re-arrange equipment layout to reduce labor costs $11,440 $2,500 - - - $11,440 - -
TOTAL RECOMMENDED $133,689 $59,442 $17,403
642,204
kWh
$75,957
-
kW-mo/yr
$9,953
-
MMBtu
$11,440 $4,536 $14,400
TOTAL IMPLEMENTED $48,220 $48,323 $15,079
556,446
kWh
$1,757
-
kW-mo/yr
- $11,440 $5,544 $14,400
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs