ITAC Assessment: SD0505
ITAC logo
ITAC Assessment: SD0505
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Explosive Ordinance
NAICS 332993: Ammunition (except Small Arms) Manufacturing
SIC 3483: Ammunition, Except for Small Arms
Sales Range $50
M
to 100
M
# of Employees 341
Plant Area 125,904
ft2
Annual Production 9,845,856
pieces
Production Hrs. Annual 7,280
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,356,242 11,669,600
kWh
Electricity Demand $74,074 26,936
kW-mo/yr
Electricity Fees $40,691 -
Natural Gas $566,119 78,481
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,354 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $20,022

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.4231: Reduce the pressure of compressed air to the minimum required $6,430 - $6,430
55,335
kWh
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,022 $2,400 $20,022
167,116
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $11,899 $10,561 $11,517
99,115
kWh
$382
-
kW-mo/yr
-
04 2.4133: Use most efficient type of electric motors $17,230 $18,098 $16,490
141,916
kWh
$740
-
kW-mo/yr
-
05 2.4112: Install soft-start to eliminate nuisance trips $7,773 $17,794 $(-3,254.0)
(-28,007)
kWh
$(-104.0)
-
kW-mo/yr
$11,131
-
MMBtu
TOTAL RECOMMENDED $63,354 $48,853 $51,205
435,475
kWh
$1,018
-
kW-mo/yr
$11,131
-
MMBtu
TOTAL IMPLEMENTED $20,022 $2,400 $20,022
167,116
kWh
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs