ITAC Assessment: OK0655
ITAC logo
ITAC Assessment: OK0655
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Aircraft Engines & Parts (Rebuild & Repair)
NAICS 336412: Aircraft Engine and Engine Parts Manufacturing
SIC 3724: Aircraft Engines and Engine Parts
Sales Range greater than $500
M
# of Employees 500
Plant Area 725,000
ft2
Annual Production 15
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,409,881 21,220,109
kWh
Electricity Demand $79,442 33,092
kW-mo/yr
Electricity Fees $1,379 -
Natural Gas $160,917 37,482
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $124,955 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6232: Install set-back timers $21,416 $543 - - $21,416
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $13,168 $1,300 $12,395
234,768
kWh
$773
-
kW-mo/yr
-
03 2.1224: Replace boiler $45,804 $53,815 n/a - - $45,804
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $38,818 $30,499 $38,818
784,195
kWh
- -
05 2.2442: Preheat combustion air with waste heat $5,749 $25,000 - - $5,749
-
MMBtu
TOTAL RECOMMENDED $124,955 $111,157 $51,213
1,018,963
kWh
$773
-
kW-mo/yr
$72,969
-
MMBtu
TOTAL IMPLEMENTED - - - - -