Assessment Year | 2003 |
---|---|
Principal Product | Aircraft Engines & Parts (Rebuild & Repair) |
NAICS | 336412: Aircraft Engine and Engine Parts Manufacturing |
SIC | 3724: Aircraft Engines and Engine Parts |
Sales Range | greater than $500 M |
# of Employees | 500 |
Plant Area |
725,000
ft2
|
Annual Production | 15
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,409,881 | 21,220,109 |
kWh
|
$0.066 |
Electricity Demand | $79,442 | 33,092 |
kW-mo/yr
|
$2.40 |
Electricity Fees | $1,379 | - |
|
- |
Natural Gas | $160,917 | 37,482 |
MMBtu
|
$4.29 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $124,955 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6232: Install set-back timers | $21,416 | $543 | - | - |
$21,416
-
MMBtu
|
|
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,168 | $1,300 |
$12,395
234,768
kWh
|
$773
-
kW-mo/yr
|
- | |
03 | 2.1224: Replace boiler | $45,804 | $53,815 | n/a | - | - |
$45,804
-
MMBtu
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $38,818 | $30,499 |
$38,818
784,195
kWh
|
- | - | |
05 | 2.2442: Preheat combustion air with waste heat | $5,749 | $25,000 | - | - |
$5,749
-
MMBtu
|
|
TOTAL RECOMMENDED | $124,955 | $111,157 |
$51,213
1,018,963
kWh
|
$773
-
kW-mo/yr
|
$72,969
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs