ITAC Assessment: OK0652
ITAC logo
ITAC Assessment: OK0652
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Electric and Hydraulic Crane
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $10
M
to 50
M
# of Employees 115
Plant Area 100,000
ft2
Annual Production 3,360
pieces
Production Hrs. Annual 2,340
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $75,585 1,910,240
kWh
Electricity Fees $1,304 -
Natural Gas $20,764 4,018
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $130,268 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,551

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.6232: Install set-back timers $2,551 $20 - $2,551
-
MMBtu
-
02 2.7135: Install occupancy sensors $482 $441 $482
12,168
kWh
- -
03 2.7232: Replace existing hvac unit with high efficiency model $9,884 $26,000 - $9,884
-
MMBtu
-
04 4.424: Improve space comfort conditioning $37,928 $6,058 $20
515
kWh
- $37,908
05 4.642: Install sensors to detect and avoid jams $2,600 $515 - - $2,600
06 2.7145: Install skylights $3,503 $22,350 $3,503
88,452
kWh
- -
07 4.445: Install equipment to move product $16,640 $25,000 - - $16,640
08 4.445: Install equipment to move product $33,280 $4,000 - - $33,280
09 4.445: Install equipment to move product $23,400 $15,000 - - $23,400
TOTAL RECOMMENDED $130,268 $99,384 $4,005
101,135
kWh
$12,435
-
MMBtu
$113,828
TOTAL IMPLEMENTED $2,551 $20 - $2,551
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs