ITAC Assessment: OK0644
ITAC logo
ITAC Assessment: OK0644
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Flour and Corn Tortilla
NAICS
n/a
SIC 2099: Food Preparations, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 65
Plant Area 50,000
ft2
Annual Production 12,480,000
lb
Production Hrs. Annual 4,524
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $27,379 947,300
kWh
Electricity Fees $180 -
Natural Gas $80,323 12,437
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $232,354 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,011

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Personnel Changes Savings
01 2.7232: Replace existing hvac unit with high efficiency model $190 $280 $190
5,429
kWh
- -
02 2.7144: Install spectral reflectors / delamp $570 $3 - $570
-
MMBtu
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $1,441 $1,738 $1,441
46,641
kWh
- -
04 2.2414: Use waste heat from hot flue gases to preheat $6,779 $5,835 - $6,779
-
MMBtu
-
05 4.441: Install automatic packing equipment $223,374 $103,500 - - $223,374
TOTAL RECOMMENDED $232,354 $111,356 $1,631
52,070
kWh
$7,349
-
MMBtu
$223,374
TOTAL IMPLEMENTED $2,011 $1,741 $1,441
46,641
kWh
$570
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs