| Assessment Year | 2002 |
|---|---|
| Principal Product | Fire Tube Boilers |
| NAICS |
n/a
|
| SIC | 3433: Heating Equipment, Except Electric and Warm Air Furnaces |
| Sales Range | $10 M to 50M |
| # of Employees | 85 |
| Plant Area |
80,000
ft2
|
| Annual Production | 250
pieces
|
| Production Hrs. Annual | 2,600
hrs
|
| Location (State) | Kansas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $25,281 | 760,560 |
kWh
|
$0.033 |
| Electricity Demand | $13,749 | - |
|
- |
| Electricity Fees | $460 | - |
|
- |
| Natural Gas | $171,519 | 32,346 |
MMBtu
|
$5.30 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $183,780 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $128,268 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.6232: Install set-back timers | $3,635 | $558 | - | - |
$3,635
-
MMBtu
|
- | - | |
| 02 | 2.3212: Optimize plant power factor | $2,012 | $3,430 | - | - | - | - | $2,012 | |
| 03 | 4.426: Modify workload | $17,500 | $2,500 | - | - | - | $17,500 | - | |
| 04 | 2.2511: Insulate bare equipment | $1,163 | $1,440 | - | - |
$1,163
-
MMBtu
|
- | - | |
| 05 | 4.111: Add equipment/ operators to reduce production bottleneck | $36,000 | $384 | - | - | - | $36,000 | - | |
| 06 | 4.122: Develop standard procedures to improve internal yields | $117,500 | $4,800 | - | - | - | $117,500 | - | |
| 07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,970 | $300 |
$4,870
149,733
kWh
|
$1,200
-
kW-mo/yr
|
- | $(-100.0) | - | |
| TOTAL RECOMMENDED | $183,780 | $13,412 |
$4,870
149,733
kWh
|
$1,200
-
kW-mo/yr
|
$4,798
-
MMBtu
|
$170,900 | $2,012 | ||
| TOTAL IMPLEMENTED | $128,268 | $7,098 |
$4,870
149,733
kWh
|
$1,200
-
kW-mo/yr
|
$4,798
-
MMBtu
|
$117,400 | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs