ITAC Assessment: OK0637
ITAC logo
ITAC Assessment: OK0637
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2002
Principal Product Wood Crates and Pallets
NAICS
n/a
SIC 2448: Wood Pallets and Skids
Sales Range $1
M
to 5
M
# of Employees 40
Plant Area 20,000
ft2
Annual Production 250,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $19,094 742,550
kWh
Electricity Demand $12,266 -
Electricity Fees $2,404 -
Natural Gas $1,225 127
MMBtu
LPG $5,959 694
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $14,774 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,271

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Primary Product Savings
01 2.6232: Install set-back timers $503 $2 - - $503
-
MMBtu
- -
02 2.7135: Install occupancy sensors $91 $185 $91
2,496
kWh
- - - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $6,484 - - $6,484
-
kW-mo/yr
- - -
04 4.611: Begin a practice of predictive / preventative maintenance $5,814 $8,286 - - - - $5,814
05 2.4239: Eliminate or reduce compressed air usage $1,882 $630 $1,618
44,428
kWh
$564
-
kW-mo/yr
- $(-300.0) -
TOTAL RECOMMENDED $14,774 $9,103 $1,709
46,924
kWh
$7,048
-
kW-mo/yr
$503
-
MMBtu
$(-300.0) $5,814
TOTAL IMPLEMENTED $14,271 $9,101 $1,709
46,924
kWh
$7,048
-
kW-mo/yr
- $(-300.0) $5,814
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs