ITAC Assessment: OK0629
ITAC logo
ITAC Assessment: OK0629
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Commercial Printing
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area 60,000
ft2
Annual Production 250,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,624 2,621,080
kWh
Electricity Demand $87,993 8,340
kW-mo/yr
Electricity Fees $6,509 -
Natural Gas $13,691 7,719
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $206,835 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $12,218

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.4221: Install compressor air intakes in coolest locations $947 $308 $565
21,900
kWh
$382
-
kW-mo/yr
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,735 $180 $4,319
167,400
kWh
$2,416
-
kW-mo/yr
- - -
03 4.652: Replace existing equipment with more suitable substitutes $193,540 $25,975 - - - $193,540 -
04 2.7229: Air condition only space necessary $4,536 $400 - - $4,536
-
MMBtu
- -
05 2.6218: Turn off equipment when not in use $190 - $190
7,352
kWh
- - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $495 $374 $85
3,294
kWh
$57
-
kW-mo/yr
- $166 $187
07 2.7135: Install occupancy sensors $392 $627 $392
15,205
kWh
- - - -
TOTAL RECOMMENDED $206,835 $27,864 $5,551
215,151
kWh
$2,855
-
kW-mo/yr
$4,536
-
MMBtu
$193,706 $187
TOTAL IMPLEMENTED $12,218 $888 $4,884
189,300
kWh
$2,798
-
kW-mo/yr
$4,536
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs