| Assessment Year | 2001 |
|---|---|
| Principal Product | Heat Exchanger |
| NAICS |
n/a
|
| SIC | 3443: Fabricated Plate Work (Boiler Shops) |
| Sales Range | $1 M to 5M |
| # of Employees | 34 |
| Plant Area |
33,350
ft2
|
| Annual Production | 420
pieces
|
| Production Hrs. Annual | 2,080
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $17,804 | 320,280 |
kWh
|
$0.056 |
| Electricity Fees | $313 | - |
|
- |
| Natural Gas | $12,233 | 1,965 |
MMBtu
|
$6.23 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $17,391 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,102 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,592 | $615 |
$223
6,588
kWh
|
$39
-
kW-mo/yr
|
- | $300 | $1,030 | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $238 | $1,470 |
$100
2,962
kWh
|
$74
-
kW-mo/yr
|
- | - | $64 | |
| 03 | 2.7135: Install occupancy sensors | $129 | $240 |
$129
3,828
kWh
|
- | - | - | - | |
| 04 | 2.2135: Repair and eliminate steam leaks | $1,442 | $200 |
$828
24,500
kWh
|
$614
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.6232: Install set-back timers | $8,700 | $1,170 | - | - |
$8,700
-
MMBtu
|
- | - | |
| 06 | 2.2437: Recover waste heat from equipment | $1,130 | $40 | - | - |
$1,130
-
MMBtu
|
- | - | |
| 07 | 3.2176: Increase use of automation | $4,160 | $38,900 | - | - | - | $4,160 | - | |
| TOTAL RECOMMENDED | $17,391 | $42,635 |
$1,280
37,878
kWh
|
$727
-
kW-mo/yr
|
$9,830
-
MMBtu
|
$4,460 | $1,094 | ||
| TOTAL IMPLEMENTED | $13,102 | $3,495 |
$1,151
34,050
kWh
|
$727
-
kW-mo/yr
|
$9,830
-
MMBtu
|
$300 | $1,094 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs