Assessment Year | 2001 |
---|---|
Principal Product | Aluminum Foil |
NAICS |
n/a
|
SIC | 3353: Aluminum Sheet, Plate, and Foil |
Sales Range | $50 M to 100M |
# of Employees | 200 |
Plant Area |
275,000
ft2
|
Annual Production | 3,750
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | Arkansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $333,544 | 40,869,000 |
kWh
|
$0.008 |
Electricity Demand | $696,105 | 275,000 |
kW-mo/yr
|
$2.53 |
Electricity Fees | $196,555 | - |
|
- |
Natural Gas | $3,623,445 | 864,066 |
MMBtu
|
$4.19 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $2,667,711 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $558,957 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7144: Install spectral reflectors / delamp | $447 | $2,790 |
$129
15,800
kWh
|
$318
-
kW-mo/yr
|
- | - | |
02 | 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available | $1,570 | $1,040 |
$733
89,352
kWh
|
$837
-
kW-mo/yr
|
- | - | |
03 | 2.4221: Install compressor air intakes in coolest locations | $17,387 | $4,428 |
$721
87,900
kWh
|
- |
$16,666
-
MMBtu
|
- | |
04 | 2.4225: Install common header on compressors | $11,108 | $7,010 |
$6,698
816,870
kWh
|
$4,410
-
kW-mo/yr
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,001 | $25,778 | n/a |
$6,028
735,183
kWh
|
$3,973
-
kW-mo/yr
|
- | - |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,349 | $21,884 |
$4,437
541,148
kWh
|
$2,912
-
kW-mo/yr
|
- | - | |
07 | 2.2442: Preheat combustion air with waste heat | $1,930,557 | $208,000 | n/a | - | - |
$1,930,557
-
MMBtu
|
- |
08 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $13,739 | $3,900 | - | - |
$13,739
-
MMBtu
|
- | |
09 | 2.1121: Use insulation in furnaces to facilitate heating / cooling | $135,553 | $58,580 | n/a | - | - |
$135,553
-
MMBtu
|
- |
10 | 4.111: Add equipment/ operators to reduce production bottleneck | $540,000 | $125,040 | - | - | - | $540,000 | |
TOTAL RECOMMENDED | $2,667,711 | $458,450 |
$18,746
2,286,253
kWh
|
$12,450
-
kW-mo/yr
|
$2,096,515
-
MMBtu
|
$540,000 | ||
TOTAL IMPLEMENTED | $558,957 | $130,508 |
$1,454
177,252
kWh
|
$837
-
kW-mo/yr
|
$16,666
-
MMBtu
|
$540,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Primary Product Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs