Assessment Year | 2001 |
---|---|
Principal Product | Water Proofing Membrane |
NAICS |
n/a
|
SIC | 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products |
Sales Range | $10 M to 50M |
# of Employees | 35 |
Plant Area |
15,120
ft2
|
Annual Production | 30,000
thousand feet
|
Production Hrs. Annual | 3,650
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $63,011 | 1,682,082 |
kWh
|
$0.037 |
Electricity Fees | $40,760 | - |
|
- |
Natural Gas | $25,865 | 10,336 |
MMBtu
|
$2.50 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $75,853 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,527 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.6232: Install set-back timers | $10,756 | $1,026 | - | - |
$10,756
-
MMBtu
|
- | - | |
02 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,071 | $4,000 | - | - |
$2,071
-
MMBtu
|
- | - | |
03 | 2.2136: Install / repair insulation on steam lines | $456 | $2,600 | - | - |
$456
-
MMBtu
|
- | - | |
04 | 2.2136: Install / repair insulation on steam lines | $2,475 | $7,120 | - | - |
$2,475
-
MMBtu
|
- | - | |
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,508 | $6,000 | - | - |
$3,508
-
MMBtu
|
- | - | |
06 | 3.5311: Recover and reuse waste material | $54,883 | $20,680 |
$18,883
503,550
kWh
|
- | - | $36,000 | - | |
07 | 2.6231: Utilize controls to operate equipment only when needed | $1,400 | $572 |
$1,400
36,635
kWh
|
- | - | - | - | |
08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $304 | $125 |
$49
1,314
kWh
|
$215
-
kW-mo/yr
|
- | $108 | $(-68.0) | |
TOTAL RECOMMENDED | $75,853 | $42,123 |
$20,332
541,499
kWh
|
$215
-
kW-mo/yr
|
$19,266
-
MMBtu
|
$36,108 | $(-68.0) | ||
TOTAL IMPLEMENTED | $2,527 | $6,600 | - | - |
$2,527
-
MMBtu
|
- | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs