ITAC Assessment: OK0613
ITAC logo
ITAC Assessment: OK0613
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Water Proofing Membrane
NAICS
n/a
SIC 2851: Paints, Varnishes, Lacquers, Enamels, and Allied Products
Sales Range $10
M
to 50
M
# of Employees 35
Plant Area 15,120
ft2
Annual Production 30,000
thousand feet
Production Hrs. Annual 3,650
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $63,011 1,682,082
kWh
Electricity Fees $40,760 -
Natural Gas $25,865 10,336
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,853 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,527

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.6232: Install set-back timers $10,756 $1,026 - - $10,756
-
MMBtu
- -
02 2.1233: Analyze flue gas for proper air/fuel ratio $2,071 $4,000 - - $2,071
-
MMBtu
- -
03 2.2136: Install / repair insulation on steam lines $456 $2,600 - - $456
-
MMBtu
- -
04 2.2136: Install / repair insulation on steam lines $2,475 $7,120 - - $2,475
-
MMBtu
- -
05 2.1233: Analyze flue gas for proper air/fuel ratio $3,508 $6,000 - - $3,508
-
MMBtu
- -
06 3.5311: Recover and reuse waste material $54,883 $20,680 $18,883
503,550
kWh
- - $36,000 -
07 2.6231: Utilize controls to operate equipment only when needed $1,400 $572 $1,400
36,635
kWh
- - - -
08 2.7142: Utilize higher efficiency lamps and/or ballasts $304 $125 $49
1,314
kWh
$215
-
kW-mo/yr
- $108 $(-68.0)
TOTAL RECOMMENDED $75,853 $42,123 $20,332
541,499
kWh
$215
-
kW-mo/yr
$19,266
-
MMBtu
$36,108 $(-68.0)
TOTAL IMPLEMENTED $2,527 $6,600 - - $2,527
-
MMBtu
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs