ITAC Assessment: OK0610
ITAC logo
ITAC Assessment: OK0610
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Tube Bending
NAICS
n/a
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $5
M
to 10
M
# of Employees 55
Plant Area 71,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,990
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $74,010 1,369,578
kWh
Electricity Fees $1,429 -
Natural Gas $19,252 4,106
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $335,059 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Primary Product Savings
01 2.6232: Install set-back timers $14,000 $1,670 - - $14,000
-
MMBtu
- -
02 2.6231: Utilize controls to operate equipment only when needed $4,700 $1,110 - $4,700
-
kW-mo/yr
- - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,939 $16,000 $1,188
21,996
kWh
$751
-
kW-mo/yr
- - -
04 3.3122: Use filtration, centrifuging to remove contaminants $2,420 $1,235 - - - $2,420
-
gal
-
05 2.6231: Utilize controls to operate equipment only when needed $312,000 $150,000 - - - - $312,000
TOTAL RECOMMENDED $335,059 $170,015 $1,188
21,996
kWh
$5,451
-
kW-mo/yr
$14,000
-
MMBtu
$2,420
-
gal
$312,000
TOTAL IMPLEMENTED $14,000 $1,670 - - $14,000
-
MMBtu
- -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs