| Assessment Year | 2000 |
|---|---|
| Principal Product | Brass Pipe Fittings |
| NAICS |
n/a
|
| SIC | 3494: Valves and Pipe Fittings, Not Elsewhere Classified |
| Sales Range | $10 M to 50M |
| # of Employees | 400 |
| Plant Area |
115,000
ft2
|
| Annual Production | 18,940,541
lb
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $182,668 | 7,080,598 |
kWh
|
$0.026 |
| Electricity Demand | $98,433 | - |
|
- |
| Electricity Fees | $6,470 | - |
|
- |
| Natural Gas | $20,657 | 5,796 |
MMBtu
|
$3.56 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $663,292 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $397,327 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
|---|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $621 | $1,212 |
$468
18,171
kWh
|
$153
-
kW-mo/yr
|
- | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $520 | $708 |
$189
7,327
kWh
|
$59
-
kW-mo/yr
|
$272 | - | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $19,857 | $90,984 |
$10,134
361,958
kWh
|
$8,603
-
kW-mo/yr
|
- | $1,120 | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,695 | $3,700 |
$4,695
121,336
kWh
|
- | - | - | |
| 05 | 2.7135: Install occupancy sensors | $664 | $2,106 |
$664
25,791
kWh
|
- | - | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,855 | $6,930 |
$4,855
188,159
kWh
|
- | - | - | |
| 07 | 3.2176: Increase use of automation | $367,920 | $150,000 | - | - | $367,920 | - | |
| 08 | 4.446: Automate finishing process | $227,760 | $30,000 | - | - | $227,760 | - | |
| 09 | 4.711: Initiate a total quality management program | $36,400 | $65,450 | - | - | - | $36,400 | |
| TOTAL RECOMMENDED | $663,292 | $351,090 |
$21,005
722,742
kWh
|
$8,815
-
kW-mo/yr
|
$595,952 | $37,520 | ||
| TOTAL IMPLEMENTED | $397,327 | $251,614 |
$19,684
671,453
kWh
|
$8,603
-
kW-mo/yr
|
$367,920 | $1,120 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Personnel Changes Savings | Ancillary Material Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs