ITAC Assessment: MAS031
ITAC logo
ITAC Assessment: MAS031
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product Hollow Glass Microspheres
NAICS 327212: Other Pressed and Blown Glass and Glassware Manufacturing
SIC 3229: Pressed and Blown Glass and Glassware, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 12
Plant Area 20,000
ft2
Annual Production 208,000
lb
Production Hrs. Annual 6,240
hrs
Location (State) Massachusetts

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $192,292 1,817,400
kWh
Electricity Demand $22,822 5,822
kW-mo/yr
Electricity Fees $2,400 -
Natural Gas $297,206 28,317
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $63,740 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,145

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.2427: Use waste heat from hot flue gases to preheat incoming fluids $42,399 $35,000 - $42,399
-
MMBtu
-
02 2.8121: Apply for tax-free status for energy purchases $13,552 $150 - - $13,552
03 2.4231: Reduce the pressure of compressed air to the minimum required $4,640 $200 $4,640
43,860
kWh
- -
04 2.6218: Turn off equipment when not in use $2,556 $900 $2,556
24,162
kWh
- -
05 2.2511: Insulate bare equipment $593 $425 - $593
-
MMBtu
-
TOTAL RECOMMENDED $63,740 $36,675 $7,196
68,022
kWh
$42,992
-
MMBtu
$13,552
TOTAL IMPLEMENTED $14,145 $575 - $593
-
MMBtu
$13,552