ITAC Assessment: OK0591
ITAC logo
ITAC Assessment: OK0591
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Rebuilt Transmissions
NAICS
n/a
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 600
Plant Area 220,000
ft2
Annual Production 146,332
pieces
Production Hrs. Annual 4,940
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $152,348 6,566,530
kWh
Electricity Demand $119,234 -
Natural Gas $76,726 26,593
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $214,164 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,792

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $315 $1,900 $315
13,834
kWh
- - - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,477 $4,942 $1,477
64,185
kWh
- - - -
03 2.7135: Install occupancy sensors $875 $136 - $875
-
kW-mo/yr
- - -
04 2.1331: Burn a less expensive grade of fuel $9,042 $230,000 - - $9,042
-
MMBtu
- -
05 3.3125: Use distillation, evaporation to remove contaminants $181,048 $59,400 - - - $181,048
-
gal
-
06 4.323: Optimize lot sizes to reduce inventory carrying costs $21,407 $30,000 - - - - $21,407
TOTAL RECOMMENDED $214,164 $326,378 $1,792
78,019
kWh
$875
-
kW-mo/yr
$9,042
-
MMBtu
$181,048
-
gal
$21,407
TOTAL IMPLEMENTED $1,792 $6,842 $1,792
78,019
kWh
- - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs