Assessment Year | 2000 |
---|---|
Principal Product | Electric Motors |
NAICS |
n/a
|
SIC | 3621: Motors and Generators |
Sales Range | $100 M to 500M |
# of Employees | 470 |
Plant Area |
400,000
ft2
|
Annual Production | 800,000
units
|
Production Hrs. Annual | 6,240
hrs
|
Location (State) | Oklahoma |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $316,296 | 9,760,258 |
kWh
|
$0.032 |
Electricity Demand | $198,342 | - |
|
- |
Natural Gas | $48,456 | 11,717 |
MMBtu
|
$4.14 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $107,523 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $12,131 | $24,500 |
$12,131
(-147,421)
kWh
|
- | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $757 | $800 |
$535
16,120
kWh
|
$222
-
kW-mo/yr
|
- | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $10,673 | $3,000 |
$7,546
228,605
kWh
|
$3,127
-
kW-mo/yr
|
- | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $525 | $60 |
$154
11,137
kWh
|
$371
-
kW-mo/yr
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,662 | $6,960 |
$1,367
99,941
kWh
|
$3,295
-
kW-mo/yr
|
- | - | |
06 | 3.1191: Change procedures / equipment / operating conditions | $36,400 | $65,450 | - | - |
$36,400
-
lb
|
- | |
07 | 4.111: Add equipment/ operators to reduce production bottleneck | $18,000 | - | - | - | - | $18,000 | |
08 | 4.111: Add equipment/ operators to reduce production bottleneck | $24,375 | $65,000 | - | - | - | $24,375 | |
TOTAL RECOMMENDED | $107,523 | $165,770 |
$21,733
208,382
kWh
|
$7,015
-
kW-mo/yr
|
$36,400
-
lb
|
$42,375 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs