ITAC Assessment: OK0588
ITAC logo
ITAC Assessment: OK0588
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Electric Motors
NAICS
n/a
SIC 3621: Motors and Generators
Sales Range $100
M
to 500
M
# of Employees 470
Plant Area 400,000
ft2
Annual Production 800,000
units
Production Hrs. Annual 6,240
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $316,296 9,760,258
kWh
Electricity Demand $198,342 -
Natural Gas $48,456 11,717
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $107,523 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $12,131 $24,500 $12,131
(-147,421)
kWh
- - -
02 2.4221: Install compressor air intakes in coolest locations $757 $800 $535
16,120
kWh
$222
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,673 $3,000 $7,546
228,605
kWh
$3,127
-
kW-mo/yr
- -
04 2.7111: Reduce illumination to minimum necessary levels $525 $60 $154
11,137
kWh
$371
-
kW-mo/yr
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,662 $6,960 $1,367
99,941
kWh
$3,295
-
kW-mo/yr
- -
06 3.1191: Change procedures / equipment / operating conditions $36,400 $65,450 - - $36,400
-
lb
-
07 4.111: Add equipment/ operators to reduce production bottleneck $18,000 - - - - $18,000
08 4.111: Add equipment/ operators to reduce production bottleneck $24,375 $65,000 - - - $24,375
TOTAL RECOMMENDED $107,523 $165,770 $21,733
208,382
kWh
$7,015
-
kW-mo/yr
$36,400
-
lb
$42,375
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs