| Assessment Year | 2025 |
|---|---|
| Principal Product | Aerospace Manufacturing |
| NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
| SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 239 |
| Plant Area |
106,857
ft2
|
| Annual Production | 50,000
pieces
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Washington |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $368,394 | 4,221,600 |
kWh
|
$0.087 |
| Electricity Fees | $19,389 | - |
|
- |
| Natural Gas | $69,724 | 7,700 |
MMBtu
|
$9.06 |
| Other Gas | $3,641 | 1 |
MMBtu
|
$3,641.00 |
| TOTAL YEARLY COSTS | $461,148 | |||
| RECOMMENDED SAVINGS* | $139,874 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $31,747 | $15,000 |
$31,747
352,745
kWh
|
- | |
| 02 | 2.2113: Repair or replace steam traps | $30,117 | $4,550 | - |
$30,117
-
MMBtu
|
|
| 03 | 2.7232: Replace existing hvac unit with high efficiency model | $20,963 | $191,676 |
$(-14,433.0)
(-157,125)
kWh
|
$35,396
-
MMBtu
|
|
| 04 | 4.662: Level one – add communication using iiot devices to existing control system to modify operations | $55,282 | $123,500 |
$55,282
633,240
kWh
|
- | |
| 05 | 2.2123: Insulate feedwater tank | $815 | $443 | - |
$815
-
MMBtu
|
|
| 06 | 2.2515: Use optimum thickness insulation | $950 | $3,710 | - |
$950
-
MMBtu
|
|
| TOTAL RECOMMENDED | $139,874 | $338,879 |
$72,596
828,860
kWh
|
$67,278
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs