ITAC Assessment: SD0389
ITAC logo
ITAC Assessment: SD0389
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Tomato Paste
NAICS 311421: Fruit and Vegetable Canning
SIC 2033: Canned Fruits, Vegetables, Preserves, Jams, and Jellies
Sales Range $5
M
to 10
M
# of Employees 150
Plant Area 200,000
ft2
Annual Production 7,000,000
lb
Production Hrs. Annual 5,124
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $671,077 9,065,393
kWh
Electricity Demand $204,564 22,980
kW-mo/yr
Natural Gas $6,603,311 931,213
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $233,444 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,543

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.3412: Use waste heat to produce steam to drive a steam turbine-generator $231,300 $1,500,000 $202,331
2,734,200
kWh
$28,969
-
kW-mo/yr
-
02 2.7134: Use photocell controls $846 $480 $392
5,304
kWh
$454
-
kW-mo/yr
-
03 2.7142: Utilize higher efficiency lamps and/or ballasts $433 $2,797 $273
3,686
kWh
$160
-
kW-mo/yr
-
04 2.2414: Use waste heat from hot flue gases to preheat $601 $4,125 - - $601
-
MMBtu
05 2.7142: Utilize higher efficiency lamps and/or ballasts $264 $1,006 $167
2,257
kWh
$97
-
kW-mo/yr
-
TOTAL RECOMMENDED $233,444 $1,508,408 $203,163
2,745,447
kWh
$29,680
-
kW-mo/yr
$601
-
MMBtu
TOTAL IMPLEMENTED $1,543 $4,283 $832
11,247
kWh
$711
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs