Assessment Year | 2012 |
---|---|
Principal Product | Foam molded packaging products |
NAICS | 326140: Polystyrene Foam Product Manufacturing |
SIC | 3086: Plastics Foam Products |
Sales Range | $5 M to 10M |
# of Employees | 31 |
Plant Area |
152,000
ft2
|
Annual Production | 1,500,000
lb
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $187,929 | 1,937,970 |
kWh
|
$0.097 |
Electricity Demand | $106,885 | 9,834 |
kW-mo/yr
|
$10.87 |
Electricity Fees | $4,800 | - |
|
- |
Natural Gas | $238,714 | 35,937 |
MMBtu
|
$6.64 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $27,254 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $12,174 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $10,588 | $9,425 | - |
$10,588
-
kW-mo/yr
|
- | |
02 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,359 | $5,625 |
$3,359
34,630
kWh
|
- | - | |
03 | 2.2136: Install / repair insulation on steam lines | $3,287 | $6,060 | - | - |
$3,287
-
MMBtu
|
|
04 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $3,220 | $4,900 |
$3,220
33,202
kWh
|
- | - | |
05 | 2.6212: Turn off equipment during breaks, reduce operating time | $3,040 | $2,080 |
$1,719
17,725
kWh
|
- |
$1,321
-
MMBtu
|
|
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,371 | $2,930 |
$1,371
14,140
kWh
|
- | - | |
07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,254 | $100 |
$1,254
12,928
kWh
|
- | - | |
08 | 2.7447: Install vinyl strip / high speed / air curtain doors | $803 | $1,200 | - | - |
$803
-
MMBtu
|
|
09 | 2.6213: Turn off steam / hot water lines leading to space heating units | $332 | $150 | - | - |
$332
-
MMBtu
|
|
TOTAL RECOMMENDED | $27,254 | $32,470 |
$10,923
112,625
kWh
|
$10,588
-
kW-mo/yr
|
$5,743
-
MMBtu
|
||
TOTAL IMPLEMENTED | $12,174 | $9,675 |
$1,254
12,928
kWh
|
$10,588
-
kW-mo/yr
|
$332
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |