ITAC Assessment: MA0224
ITAC logo
ITAC Assessment: MA0224
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1991
Principal Product NON-WOVEN FABRICS
NAICS
n/a
SIC 2299: Textile goods, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area
n/a
Annual Production 27,900
thousand feet
Production Hrs. Annual 7,488
hrs
Location (State) New Hampshire

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $563,915 7,590,856
kWh
LPG $131,238 25,003
MMBtu
Fuel Oil #6 $138,957 43,398
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $179,558 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,693

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings LPG Savings Fuel Oil #6 Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $46,881 - $56,316
758,206
kWh
$(-9,435.0)
-
MMBtu
- -
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $71,552 - $88,325
1,189,039
kWh
$(-16,773.0)
-
MMBtu
- -
03 2.2444: Use hot process fluids to preheat incoming process fluids $25,667 $19,927 - $25,667
-
MMBtu
- -
04 2.2113: Repair or replace steam traps $21,213 $35,000 - - $24,093
-
MMBtu
$(-2,880.0)
05 2.7142: Utilize higher efficiency lamps and/or ballasts $8,079 $16,200 $8,079
108,734
kWh
- - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,765 $1,500 $2,765
37,222
kWh
- - -
07 2.2511: Insulate bare equipment $1,859 $2,250 - - $1,859
-
MMBtu
-
08 2.2414: Use waste heat from hot flue gases to preheat $1,542 $1,060 - - $1,542
-
MMBtu
-
TOTAL RECOMMENDED $179,558 $75,937 $155,485
2,093,201
kWh
$(-541.0)
-
MMBtu
$27,494
-
MMBtu
$(-2,880.0)
TOTAL IMPLEMENTED $32,693 $54,510 $8,079
108,734
kWh
- $27,494
-
MMBtu
$(-2,880.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings LPG Savings Fuel Oil #6 Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs