ITAC Assessment: OK0586
ITAC logo
ITAC Assessment: OK0586
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product Shopping carts
NAICS
n/a
SIC 3496: Miscellaneous Fabricated Wire Products
Sales Range $10
M
to 50
M
# of Employees 386
Plant Area 510,000
ft2
Annual Production 450,000
pieces
Production Hrs. Annual 5,640
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $375,486 18,164,127
kWh
Electricity Demand $384,703 -
Natural Gas $231,533 78,980
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $142,988 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $52,988

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Personnel Changes Savings
01 2.1233: Analyze flue gas for proper air/fuel ratio $8,100 $7,000 - - $8,100
-
MMBtu
- -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $13,117 $6,500 $6,208
295,428
kWh
$6,909
-
kW-mo/yr
- - -
03 2.4221: Install compressor air intakes in coolest locations $2,681 $1,000 $1,850
39,566
kWh
$831
-
kW-mo/yr
- - -
04 3.6114: Use precipitating agents in waste water treatment that produce the least quantity of waste $14,440 $30,000 - - - $14,440
-
lb
-
05 4.423: Move product using mechanical means $81,900 $50,000 - - - - $81,900
06 4.424: Improve space comfort conditioning $22,750 $50,000 - - - - $22,750
TOTAL RECOMMENDED $142,988 $144,500 $8,058
334,994
kWh
$7,740
-
kW-mo/yr
$8,100
-
MMBtu
$14,440
-
lb
$104,650
TOTAL IMPLEMENTED $52,988 $87,500 $8,058
334,994
kWh
$7,740
-
kW-mo/yr
- $14,440
-
lb
$22,750
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs