Assessment Year | 1995 |
---|---|
Principal Product | furniture |
NAICS |
n/a
|
SIC | 2511: Wood Household Furniture, Except Upholstered |
Sales Range | $10 M to 50M |
# of Employees | 106 |
Plant Area |
120,000
ft2
|
Annual Production | 112,500
pieces
|
Production Hrs. Annual | 2,167
hrs
|
Location (State) | Iowa |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $141,931 | 1,744,725 |
kWh
|
$0.081 |
Natural Gas | $24,554 | 5,529 |
MMBtu
|
$4.44 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $39,809 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $38,600 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $2,241 | $554 |
$2,241
27,550
kWh
|
- | - | - | |
02 | 2.4314: Use synthetic lubricant | $951 | $2,159 |
$951
11,723
kWh
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $736 | $25 |
$736
9,086
kWh
|
- | - | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $460 | $25 |
$460
5,569
kWh
|
- | - | - | |
05 | 2.7135: Install occupancy sensors | $681 | $770 |
$681
8,499
kWh
|
- | - | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $528 | $2,010 | - |
$528
-
MMBtu
|
- | - | |
07 | 3.1191: Change procedures / equipment / operating conditions | $28,368 | $1,100 | - | - | - |
$28,368
-
lb
|
|
08 | 3.5315: Lease / purchase baler; sell cardboard to recycler | $4,875 | $8,480 | - | - |
$4,875
-
lb
|
- | |
09 | 3.1175: Use a different or recycled raw material | $969 | - | - | - |
$969
-
lb
|
- | |
TOTAL RECOMMENDED | $39,809 | $15,123 |
$5,069
62,427
kWh
|
$528
-
MMBtu
|
$5,844
-
lb
|
$28,368
-
lb
|
||
TOTAL IMPLEMENTED | $38,600 | $12,343 |
$4,388
53,928
kWh
|
- |
$5,844
-
lb
|
$28,368
-
lb
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (non-haz) Savings | Solid Waste (haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs