Assessment Year | 2014 |
---|---|
Principal Product | Aerospace friction/brake materials |
NAICS | 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing |
SIC | 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 156 |
Plant Area |
140,000
ft2
|
Annual Production | 640,000
lb
|
Production Hrs. Annual | 8,736
hrs
|
Location (State) | Washington |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $2,888,403 | 56,001,943 |
kWh
|
$0.052 |
Electricity Demand | $542,289 | 108,495 |
kW-mo/yr
|
$5.00 |
Natural Gas | $374,236 | 573,778 |
MMBtu
|
$0.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $14,842 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $7,042 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $7,042 | $1,697 |
$7,042
135,424
kWh
|
- | |
02 | 2.4322: Use or replace with energy efficient substitutes | $4,268 | $11,600 |
$4,268
82,083
kWh
|
- | |
03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,073 | $23,840 |
$1,073
20,643
kWh
|
- | |
04 | 2.2424: Use heat in flue gases to preheat products or materials | $2,459 | $2,500 | - |
$2,459
-
MMBtu
|
|
TOTAL RECOMMENDED | $14,842 | $39,637 |
$12,383
238,150
kWh
|
$2,459
-
MMBtu
|
||
TOTAL IMPLEMENTED | $7,042 | $1,697 |
$7,042
135,424
kWh
|
- |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs