| Assessment Year | 2001 |
|---|---|
| Principal Product | Aircraft latches |
| NAICS |
n/a
|
| SIC | 3365: Aluminum Foundries |
| Sales Range | $1 M to 5M |
| # of Employees | 50 |
| Plant Area |
80,000
ft2
|
| Annual Production | 50,000
lb
|
| Production Hrs. Annual | 4,375
hrs
|
| Location (State) | California |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $64,875 | 770,830 |
kWh
|
$0.084 |
| Electricity Demand | $27,760 | 3,550 |
kW-mo/yr
|
$7.82 |
| Electricity Fees | $54,594 | - |
|
- |
| Natural Gas | $30,023 | 4,049 |
MMBtu
|
$7.41 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $26,867 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $16,670 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4239: Eliminate or reduce compressed air usage | $4,369 | $2,000 |
$2,866
34,036
kWh
|
$1,503
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.2424: Use heat in flue gases to preheat products or materials | $3,094 | $1,500 |
$1,827
21,700
kWh
|
$94
-
kW-mo/yr
|
$1,173
-
MMBtu
|
- | - | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $3,519 | $2,000 | - | - |
$3,519
-
MMBtu
|
- | - | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $822 | $200 |
$539
6,405
kWh
|
$283
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.4321: Upgrade obsolete equipment | $5,286 | $15,000 | - | - |
$5,286
-
MMBtu
|
- | - | |
| 06 | 2.7145: Install skylights | $2,734 | $6,000 |
$1,569
18,630
kWh
|
$1,165
-
kW-mo/yr
|
- | - | - | |
| 07 | 3.5222: Use sand for other purposes (eg construction fill, cover for municipal landfills) | $3,043 | $500 | - | - | - | - | $3,043 | |
| 08 | 4.513: Re-arrange equipment layout to reduce labor costs | $4,000 | $3,500 | - | - | - | $4,000 | - | |
| TOTAL RECOMMENDED | $26,867 | $30,700 |
$6,801
80,771
kWh
|
$3,045
-
kW-mo/yr
|
$9,978
-
MMBtu
|
$4,000 | $3,043 | ||
| TOTAL IMPLEMENTED | $16,670 | $21,200 |
$539
6,405
kWh
|
$283
-
kW-mo/yr
|
$8,805
-
MMBtu
|
$4,000 | $3,043 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs