ITAC Assessment: SD0273
ITAC logo
ITAC Assessment: SD0273
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Aircraft latches
NAICS
n/a
SIC 3365: Aluminum Foundries
Sales Range $1
M
to 5
M
# of Employees 50
Plant Area 80,000
ft2
Annual Production 50,000
lb
Production Hrs. Annual 4,375
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $64,875 770,830
kWh
Electricity Demand $27,760 3,550
kW-mo/yr
Electricity Fees $54,594 -
Natural Gas $30,023 4,049
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $26,867 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $16,670

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
01 2.4239: Eliminate or reduce compressed air usage $4,369 $2,000 $2,866
34,036
kWh
$1,503
-
kW-mo/yr
- - -
02 2.2424: Use heat in flue gases to preheat products or materials $3,094 $1,500 $1,827
21,700
kWh
$94
-
kW-mo/yr
$1,173
-
MMBtu
- -
03 2.2414: Use waste heat from hot flue gases to preheat $3,519 $2,000 - - $3,519
-
MMBtu
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $822 $200 $539
6,405
kWh
$283
-
kW-mo/yr
- - -
05 2.4321: Upgrade obsolete equipment $5,286 $15,000 - - $5,286
-
MMBtu
- -
06 2.7145: Install skylights $2,734 $6,000 $1,569
18,630
kWh
$1,165
-
kW-mo/yr
- - -
07 3.5222: Use sand for other purposes (eg construction fill, cover for municipal landfills) $3,043 $500 - - - - $3,043
08 4.513: Re-arrange equipment layout to reduce labor costs $4,000 $3,500 - - - $4,000 -
TOTAL RECOMMENDED $26,867 $30,700 $6,801
80,771
kWh
$3,045
-
kW-mo/yr
$9,978
-
MMBtu
$4,000 $3,043
TOTAL IMPLEMENTED $16,670 $21,200 $539
6,405
kWh
$283
-
kW-mo/yr
$8,805
-
MMBtu
$4,000 $3,043
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs