Assessment Year | 2001 |
---|---|
Principal Product | Aircraft latches |
NAICS |
n/a
|
SIC | 3365: Aluminum Foundries |
Sales Range | $1 M to 5M |
# of Employees | 50 |
Plant Area |
80,000
ft2
|
Annual Production | 50,000
lb
|
Production Hrs. Annual | 4,375
hrs
|
Location (State) | California |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $64,875 | 770,830 |
kWh
|
$0.084 |
Electricity Demand | $27,760 | 3,550 |
kW-mo/yr
|
$7.82 |
Electricity Fees | $54,594 | - |
|
- |
Natural Gas | $30,023 | 4,049 |
MMBtu
|
$7.41 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $26,867 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $16,670 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $4,369 | $2,000 |
$2,866
34,036
kWh
|
$1,503
-
kW-mo/yr
|
- | - | - | |
02 | 2.2424: Use heat in flue gases to preheat products or materials | $3,094 | $1,500 |
$1,827
21,700
kWh
|
$94
-
kW-mo/yr
|
$1,173
-
MMBtu
|
- | - | |
03 | 2.2414: Use waste heat from hot flue gases to preheat | $3,519 | $2,000 | - | - |
$3,519
-
MMBtu
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $822 | $200 |
$539
6,405
kWh
|
$283
-
kW-mo/yr
|
- | - | - | |
05 | 2.4321: Upgrade obsolete equipment | $5,286 | $15,000 | - | - |
$5,286
-
MMBtu
|
- | - | |
06 | 2.7145: Install skylights | $2,734 | $6,000 |
$1,569
18,630
kWh
|
$1,165
-
kW-mo/yr
|
- | - | - | |
07 | 3.5222: Use sand for other purposes (eg construction fill, cover for municipal landfills) | $3,043 | $500 | - | - | - | - | $3,043 | |
08 | 4.513: Re-arrange equipment layout to reduce labor costs | $4,000 | $3,500 | - | - | - | $4,000 | - | |
TOTAL RECOMMENDED | $26,867 | $30,700 |
$6,801
80,771
kWh
|
$3,045
-
kW-mo/yr
|
$9,978
-
MMBtu
|
$4,000 | $3,043 | ||
TOTAL IMPLEMENTED | $16,670 | $21,200 |
$539
6,405
kWh
|
$283
-
kW-mo/yr
|
$8,805
-
MMBtu
|
$4,000 | $3,043 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | One-time Revenue or Avoided Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs