ITAC Assessment: OK0576
ITAC logo
ITAC Assessment: OK0576
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1999
Principal Product FRP Pipe & Fittings
NAICS
n/a
SIC 3084: Plastics Pipe
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 230,000
ft2
Annual Production 0
units
Production Hrs. Annual 4,000
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $201,043 7,688,453
kWh
Electricity Demand $91,690 -
Natural Gas $234,034 80,366
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,564 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $34,029

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.1241: Reduce excessive boiler blowdown $11,368 $16,000 - - $11,368
-
MMBtu
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,672 $17,813 $3,833
154,162
kWh
$2,839
-
kW-mo/yr
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $279 $140 $279
15,240
kWh
- - - - -
04 2.4221: Install compressor air intakes in coolest locations $228 $68 $228
9,086
kWh
- - - - -
05 4.441: Install automatic packing equipment $22,560 $40,000 - - - - $22,560 -
06 4.424: Improve space comfort conditioning $4,518 $3,990 - - - - - $4,518
07 3.5311: Recover and reuse waste material $1,939 $5,000 - - - $1,939
-
lb
- -
TOTAL RECOMMENDED $47,564 $83,011 $4,340
178,488
kWh
$2,839
-
kW-mo/yr
$11,368
-
MMBtu
$1,939
-
lb
$22,560 $4,518
TOTAL IMPLEMENTED $34,029 $61,943 $4,112
169,402
kWh
$2,839
-
kW-mo/yr
- - $22,560 $4,518
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs